What can move the outcome over the life of the contract.
The analysis should refresh when regulation, market, project, state or asset assumptions materially change.
Contract may compensate energy that could have been generated but was not taken.
Wind / solar variability may be allocated differently from equipment failure.
Measurement source and correction procedures can alter revenue.